
Lu Feng field 15-2 Project 2022

Lu Feng field 15-2 Project 2022

En Ping field 10-2 Deep Water Jacket Installation 2022

En Ping field 10-2 Deep Water Jacket Installation 2022

“Qun Li” to disassemble the anemoscope tower 2022

“Qun Li” to disassemble the anemoscope tower 2022

“Qun Li” to disassemble the anemoscope tower 2022

KEA-TRADER – NEW CALEDONIA 2018

KEA-TRADER – NEW CALEDONIA 2018

Pile driving in Ivar Aasen oil field, Norway June 2015

Pile driving in Ivar Aasen oil field, Norway June 2015

Sling installation for 10000MT platform module in Franklin shipyard of Rotterdam May 2015

Spool piece installation in Cygus, UK May 2015

Lifting and installation of 2650MT Jacket CA-LITORAL-A October 2014

Lifting and installation of 2653MT ZAAP-E platform module July 2014

Lifting and installation of 2653MT ZAAP-E platform module July 2014

2843MT lifting and installation project in EK-A2 June 2014

2910MT lifting and installation project August 2013

2300MT lifting and installation project June 2013

Installation project in Brunei 2012

Installation project in Brunei 2012

Installation project in Brunei 2012

Jacket (1880T) lifting & installation, project “WHP-D ” in Indonesia 2008

Jacket lifting & installation and 1100 tons platform module installation, project “MGDP01” in Brunei 2008

THE SEWOL PASSENGER FERRY

RAISED SEWOL
